ĻĹ2019

Central Association recruitment!
Guteng Environmental Protection Network > News > Text

After 7 days, all cement clinker production lines in Liaoning Province were off-peak for 5 months

来源:中国水泥网 作者: 阅读:1538 网友评论1 Updated: 2019-10-24 11:25 Source: China Cement Net of: Read: 1538 User Reviews 1

A few days ago, the Liaoning Provincial Department of Industry and Information Technology and the Eco-Environmental Department issued the "Notice on Liaoning Province's Cement Crush Peak Production Arrangement in the Heating Period 2019-2020". The notice shows that Liaoning Province has decided to start the autumn and winter heating period and the cement clinker industry Off-peak production.

Peak shift time: November 1st, 2019 to March 31st, 2020. (The peak shift time of the kiln stop in Dalian is November 5, 2019-April 5, 2020. Range of peak shift: all cement in Liaoning Province Clinker production line. At the same time, the production lines that undertake the tasks of heating, co-processing of municipal solid waste and hazardous waste by residents shall be identified and formulated by the municipal industrial and ecological environment departments, and submitted to the Provincial Industry and Information Technology Bureau and Filed by the Department of the Environment. In principle, peak shift production is not required after filing, but the cement production load should be appropriately reduced. Original document:





Disclaimer : This article is reproduced for the purpose of passing more information. If any source is wrongly marked or violates your legal rights, please contact the author with the proof of ownership, and we will correct and delete it in time. Thank you.

Use WeChat Scan to Add Guten Environmental Protection Network

Comments on " All Clinker Production Lines in Liaoning Province Stop for 5 Months after 7 Days
1st floor ?????? 2019-11-17

How can it be discontinued! It's all flickering, right?

) 回复 Like ( 0 ) Reply

nickname: Verification code:

Netizen comments are for their personal opinions only, and do not indicate that Gutenberg agrees with their views or confirms their descriptions.

Soil Pollution Control Action Plan
Soil Pollution Control Action Plan

On May 31, after undergoing extensive solicitation of opinions, full investigation and demonstration, repeated revision and improvement ...

2015 China Water Treatment Engineering Salon Phase 2
2015 China Water Treatment Engineering Salon Phase 2

The “2015…” will be held on September 11, 2015 (Friday) at the Shangshan Huizhou Club in Beijing ...

2015 China Water Treatment Engineering Salon
2015 China Water Treatment Engineering Salon

In order to better understand the current Chinese water treatment industry, strengthen the top among the industry's top ...