Hunan Shaoyang Prison Expansion Project Phase II Project Tender Notice

demand information:
Requirements Title: Hunan Shaoyang Prison Expansion Project Phase II Project Tender Notice
Demand source: Member Post
Demand type: engineering
Original requirements: Tender conditions

The outdoor water supply and drainage project of the second phase of the Shaoyang Prison Expansion Project of this tendering project, the construction funds come from financial funds, the project funding ratio is 100 % . The bidder is Shaoyang Prison of Hunan Province, and the contractor is Hunan International Engineering Consulting Center Co., Ltd. The bidding agency is Huaxin Project Management Co., Ltd. The project is a contract construction system, and the tendering conditions are already in place.

2. Project Overview and Tendering Scope

2.1 Project Name: Outdoor Water Supply and Drainage Project of Shaoyang Prison Expansion Project Phase II Project;

2.2 Construction site: Chayuantou Township, Beita District, Shaoyang City, Hunan Province;

2.3 Scale: This project is the outdoor project of the second phase of the Shaoyang Prison Expansion Project in Hunan Province. The main contents include: outdoor water supply and drainage engineering, road engineering, landscaping engineering, outdoor fire protection, outdoor weak electricity, street lights and other projects. The cost of the project is 4,397,058.86 yuan.

2.4 Duration requirement: 180 calendar days;

2.5 Quality requirements: qualified project;

2.6 Warranty requirements: Warranty according to the State Council [2000] Decree 279 and related regulations;

2.7 Tender scope: This project is the outdoor water supply and drainage project of the second phase of the Shaoyang prison expansion project. The main contents include: outdoor water supply and drainage engineering, road engineering, landscaping engineering, outdoor fire protection, outdoor weak electricity, street lamps and other projects. For details, see the bill of quantities and construction drawings.

2.8 Division of bids: 1 bid.

3. Bidder qualification requirements

3.1 Having the status of an independent legal person and obtaining an enterprise business license in accordance with the law, the business license is valid; enterprises outside Hunan Province must complete the basic registration of foreign enterprises entering Hunan Province in accordance with the requirements of Xiangjian Jian [2015] No. 190 ("Hunan Province Housing and Urban-Rural "Construction Network" shall prevail) or have a construction registration certificate for entering Hunan (within the validity period);

3.2 Possess Level 3 and above qualifications for general contracting of construction projects or municipal public works construction issued by the competent administrative department of construction, and the safety production license is in the valid period; and it has corresponding construction capabilities in terms of personnel, equipment, and funds;

3.3 The enterprise has undertaken a construction similar project performance, and the similar project performance evaluation period is 1080 days, from the date of completion of the construction acceptance document to the date of submission of the bidding documents. Specific requirements: the performance of similar construction projects refers to the amount of a single contract Construction projects or municipal public works construction projects of not less than 2.2 million yuan;

3.4 The person in charge of the project is a registered construction engineer of Grade Ⅱ or above who specializes in construction engineering or municipal public works, and has a valid project leader's qualification certificate for safety in production assessment and no construction in progress; the detailed requirements of other personnel in key positions in the construction project department are detailed in this document. Chapter II of the Bidding Documents of the Project. Bidders must know the requirements of item 10.15.1 of the previous schedule.

3.5 Consortium bids are not accepted for this tender.

4. Bid Evaluation Method

The bid evaluation method of this project adopts the "Comprehensive Evaluation Method (I)" and Document No. 25 of Shao Jianfa [2019] No. 238 of Xiangjian Supervision [2018]. The qualification review method for this project is qualification review after bid opening.

5. Bid security

The amount of the bid deposit is: RMB 20,000 yuan ( 80000.00), which is in the form of bank guarantee or cash.

If it is submitted in the form of a bank guarantee, it shall be delivered to the agency at the bid opening site before the deadline for bidding.

If the bid deposit is paid in cash, the deadline for the bid deposit to arrive at the account is 16:00 on March 27, 2019. Each bidding unit shall transfer the corresponding basic deposit account to the escrow account for the bid security by transfer.

Bidders check the bidding announcement of this project at Shaoyang Public Resources Trading Center (http://ggzy.shaoyang.gov.cn/index.html), click the "Get Bid Margin Account Number" button at the top of the webpage, fill in the mobile phone number, and send a text Obtain the sub-account number of the bid security for this project. The account number specified in this information sheet is the only account used to pay the bid security for this project. Please keep confidential.

For the detailed requirements of the bid security, please refer to Chapter 3.4.1 of the previous schedule to Chapter II of the bidding documents of the project bidding documents. If the bidder fails to pay the bid security as required, the bid evaluation committee will deal with the invalid bidding documents after the initial review, and the potential losses shall be borne by the bidder.

6. Obtaining tender documents and clarifying Q & A

6.1 Please construct a bidding network for construction projects in Shaoyang City from March 7, 2019 to 17:00 on March 12, 2019 (Beijing time, the same below) http://zj.shaoyang.gov.cn/Node- 5009.html for online download / acquisition of bidding documents, drawings and bill of quantities. If downloaded through the Internet, its bidding documents, drawings and bill of quantities will have the same legal effect as the written bidding documents, drawings and bill of quantities.

6.2 The price of each set of bidding documents is 600 yuan, which is non-refundable after the sale. It should be paid when submitting the bidding documents.

6.3 To clarify questions and answers, use the online publishing method. Tenderers' clarifications and clarifications to the bidding documents and the bill of quantities are published on the Shaoyang Construction Project Tendering Website http://zj.shaoyang.gov.cn/Node-5009.html.

7. Submission of bid documents

7.1 The deadline for submission of bid documents (the deadline for submission of bids, the same below) and the time for bid opening are at 09:30 on March 28, 2019, at the Shaoyang Public Resources Trading Center (the annex of Shaoyang Avenue Administrative Center, the specific bid opening room) (See the electronic screen of the day when the bid was opened).

7.2 If the bidding documents are delivered late or are not delivered to the designated place or are not sealed as required, or the bidders do not obtain the bidding documents in accordance with Article 6.1 of the project bidding announcement, the bidder will refuse to accept them.

7.3 The bidder's proposed project leader of the project must personally participate in the bidding, and the authorized agent must be the project leader of the proposed project.

8. Administrative supervision

The bidding supervision agency of this bidding project is Shaoyang Construction Project Bidding Management Office, Tel: 0739-5226532.

release time: 2019-03-07
Validity period: 2019-03-27
Gu Teng audit: This information Guten.com has verified the validity.
Contact information:
Contact:
unit: View contact information for this message Please login
phone:
Handset:
E-mail:

Soil Pollution Control Action Plan
Soil Pollution Control Action Plan

On May 31, after undergoing extensive solicitation of opinions, full investigation and demonstration, repeated revision and improvement ...

2015 China Water Treatment Engineering Salon Phase 2
2015 China Water Treatment Engineering Salon Phase 2

The “2015…” will be held on September 11, 2015 (Friday) at the Shangshan Huizhou Club in Beijing ...

2015 China Water Treatment Engineering Salon
2015 China Water Treatment Engineering Salon

In order to better understand the current Chinese water treatment industry, strengthen the top among the industry's top ...